The vanity has been properly relocated to the appropriate height and it looks great-- wait, what is wrong with the sink on the right? BAH! It won't fit into the pre-cut hole once the faucet is in place! There is some notch on the bottom of the sink that won't sit flush with the counter top, though it looks identical to the one on the left. *Sigh* So, no plumbing yet. The company, Sinks Faucets and More, has been a real pleasure to work with and they are having the manufacturer ships us the correct sink today. It should be here no later than Wednesday.
So, since the Two Mikes couldn't do plumbing, they grouted the shower!
The grout is a tobacco brown and will dry much darker than what you see here. The second photo is the shower ceiling. Once the grout is done, on goes the shower head, the shower handle, the light cap, and the shower drain. Still waiting on that deflector glass though.
And they put up more trimming, along the stairwell and in the closet. The stairwell is proving to a be a challenge as the top half of the wall is wall board and the bottom is plaster and in the middle (where the bottom of the trim is now) a really bad seam where the two meet. In fact, you can see how the two types of wall meet if you look at what looks like a black dividing line going across the wall, just a bit underneath the light in the ceiling. The best option is to trim it, and I think that actually makes the space look rather interesting.
No comments:
Post a Comment