Wednesday, May 19, 2010

Framing, Done

The framing is done! The half wall is in place at the top of the stair, opening the place up.

We even have a frame for the closet in place, as well as several receptacles for future electrical outlets and light switches!

Tomorrow, the rest of the in-bound plumbing and wiring (including location of ceiling lights) will be completed, in addition to a visit from the spray foam insulation company! We are moving right along.

2 comments:

Grandmother said...

Don't skimp on the outlets! You can't have too many. Don't forget some in the closet!

Unknown said...

I think we have about 17 plugs total:

one at the top of the stairs for a vacuum, two on either side of where the bed will be, 3 in the closet, one in the old dormer, one in the new dormer for a window unit or fan, one at the top of the stairs/back of the shower wall, and a double one in the bathroom. I think there might be more, but I am forgetting...