|
Radiator capped! |
Work on the bathroom continued today after the weather the delayed work yesterday. They took out the radiator, and the tiles behind; the old pipes; and cleaned out/vacuum up the rubble on the floor.
|
Old pipes removed and rubble cleaned up. |
They have also framed out the new wall and took out the old hardwood flooring in the new area.
|
New area of the bathroom. |
|
From the back-area closet. |
Will and I measured out where we wanted to have the sink in comparison to the toilet and the new wall. We opted to keep the sink pretty much in the same location as the old one-- maybe slightly to the left. Will made sure that we were within code (15 inches on either side of the loo) while I stood in the area where the new tub will go.
|
Making sure to stay within code of where the toilet will be! |
|
In the bathtub! |
No comments:
Post a Comment