What, did you think that the kitchen was going to be done by the end 2011? Ha. We are looking at another month. You know what that means?: another month of construction photos on on the blog! I knew you would be thrilled when I told you that.
So. we have now: door/drawer handles in place. Trim everywhere. Walls resanded and ready for primer + paint. Door knobs installed on closet doors, french doors into the dining room, and the bathroom. We also have a special bathroom lock that tell us if the loo is vacant or engaged.
|
bathroom door with knob and lock |
|
the loo is available! |
|
trim installed, ready for primer! |
|
doors into the dining room |
|
closet dooors |
|
double handles on the drawers |
|
pantry
Also, we have tile! Two extra orders, two home deliveries and one pick-up late, we have the one wall of the kitchen tiled and setting. Tomorrow: grouting in a light creamy white. It looks amazing. Running the tile vertically distracts you from the fact that we have an incredibly long galley kitchen.
|
|
tile goes around the windows |
|
where tile meets counter, sans grout |
It is starting to really come together. By the end of the week, we should have the whole thing tiled, grouted, and painted. Makes coming home from work every day exciting!
No comments:
Post a Comment