At 12:06 pm today, a Christmas Miracle happened.
We got our cabinet door and drawer fronts and two cabinets back. And they are perfect. The driver left Tulsa, OK yesterday morning at 8 am, stopping 6 hours to sleep. The rest of the time he was driving like a bat outta hell to get the doors, etc here on time. We helped unload the material, and he was then off-- back to Tulsa by way of Kentucky. He is going to wave hi to my folks as he drives by Louisville in about 7 more hours.
The crew then set to getting the broom closet installed--necessary for the counter tops-- and the doors on (drawer fronts will wait to tomorrow as they are a bit harder to get on straight).
We still won't have the kitchen done by the 20th, but now we are probably going to have it back and completed by the first week of January.
No comments:
Post a Comment