The framing is done! The half wall is in place at the top of the stair, opening the place up.

We even have a frame for the closet in place, as well as several receptacles for future electrical outlets and light switches!

Tomorrow, the rest of the in-bound plumbing and wiring (including location of ceiling lights) will be completed, in addition to a visit from the spray foam insulation company! We are moving right along.
Don't skimp on the outlets! You can't have too many. Don't forget some in the closet!
ReplyDeleteI think we have about 17 plugs total:
ReplyDeleteone at the top of the stairs for a vacuum, two on either side of where the bed will be, 3 in the closet, one in the old dormer, one in the new dormer for a window unit or fan, one at the top of the stairs/back of the shower wall, and a double one in the bathroom. I think there might be more, but I am forgetting...